91色色视频手机版_久久综合亚洲色hezyo_欧美精品色精品一区二区三区_色欲v国产日韩欧美精品视频_久久91超碰色中文字幕总站

歡迎光臨深圳市凱迪賢模具有限公司官網(wǎng)!
0755-26825352
18948189678
模具英語(yǔ)100句,太實(shí)用了

/ 2021/6/5 20:40:35
 1. All in English & Imperial Unit. 全部使用英文和英制單位。
  2. Are part dimensions to print plus shrink?請檢查內模尺寸有否乘縮水?

  3. All wires protected from sharp corners?凡有電線(xiàn)通過(guò)的角位要改為R角,是否完成?

  4. All replaceable components must bestandard components. 所有替換的元件必須是標準件

  5. Add shot counter?是否加啤塑總計器?

  6. A complicated mould with thorough designconsideration toovercome the numerous design contraints. 一個(gè)復雜的模具,設計經(jīng)過(guò)周詳考慮,成功地克服了各種設計上的限制。

  7. All moving components should usehardened steel : all slidesshould be installed with hardend or lubricated alloywear plates and gibs, andwith positive slide retainer. 所有移動(dòng)的零件應使用硬鋼料,行位必須用硬墊板和硬線(xiàn)條,而且必須有限位及定位鎖。

  8. BOM including waterfittings,ejectors&custom components. BOM的內容應包含運水接頭,頂針和自制的零件。

  9. BeCu for lifters if w/o water circuits。若沒(méi)有運水回路,斜頂為鈹銅。

  10. Corresponding components mirrored atcore&cavity. 對應的部件在前、后模平面視圖中鏡像。

 

 11. Check polish for line of draw finish?有否省光就出模?

  12. Core pull slot mechanism installed andO.K.

  13. Crane capacity and loading clearance. 模具須用多大吊機才可搬動(dòng)。

  14. Conduct moldflow&mold warpanalysis. 經(jīng)流道及變形電腦模擬分析。

  15. Component and/or 3D mould designdrawing. 散件圖或3D模具圖。

  16. Cooling less important when dimensionsare not important. 若尺寸不重要,適量冷卻也可。

  17. Combine a traditional 4 cavity edgegate and a 4 cavitiesreverse gate mould which help to double the mouldingcapacity and reduceproduction cost. 將一個(gè)標準四模腔大水口模具與一個(gè)四模腔倒轉大水口模具結合成為一套可于同一大小的注塑機,生產(chǎn)量可增加一倍的層板模具,并且可降低成本。

  18. Can be seperated into two individualmoulds for moulding in twodifferent mould shops. 此模具違禁詞的特式是,可將模具分開(kāi)變成兩套,在不同地方生產(chǎn),增加生產(chǎn)的靈活性。

  19. Consists of all standard mouldcomponents which facilitatesmould maintenance. 由于全套模具均利用模具標準零件制成,在維修及換零件上比較方便。

  20. Die draw called out 出模方向的標示

 

 21. Dimension all the opening , travel& clearance. 標出前、后模距離,滑動(dòng)部件滑動(dòng)距離和塑件脫離的位置。

  22. DME egr. Water fittings recessed andmarked?是否使用DME運水接頭及編號?

  23. Delivery right side up , or in twohalves?開(kāi)箱后是否容易吊出模具及是否分開(kāi)前/后模運輸?

  24. Eyebolt size and balance in 2 sides. 吊模孔尺寸,平衡,4邊都要有。

  25. Ejection stroke & slide, liftertravel dimensioned. 出行程、行位、斜頂行程的標注。

  26. Ejection study if lifteradopted. 若有斜頂,做出分析。

  27. Ejection extended at the most. 頂出到極限位置。

  28. Ejector guide pins installation. 頂針導柱的安裝。

  29. Eyebolts for inserts more than 50lbs. 重量大于50lbs的鑲件必須要有吊模孔。

  30. Edge gate or sprue gate requiringsecondary operationacceptable. 邊緣型或直入型水口都可以接受。

 

 31. 4 point in HRC different to lifterscontacting or cavity steel. 斜頂和與其接觸的內模或鑲件在硬度上有4度的差別(HRC)。

  32. 4X size section , dimensioned toreflect the actual size. 水口及水口頂針的4倍放大視圖,按實(shí)際尺寸標注。

  33. General ,safety and handling. 常規、安全和搬運要求。

  34. Guided ejection recommended for mouldabove 100 tons clampcapacity, ejector pins of 1.5mm or smaller, or ejectorstroke longer than 50mm. 建設模具用于鎖模力超過(guò)100噸的注塑機,或有1.5mm以下的頂針或頂出行程超過(guò)50mm時(shí),應裝上頂針板導柱。

  35. Guide pin cleared and vented?邊釘插入模板有否頂著(zhù)及加疏氣空?

  36. Hot manifold wired to print and checked?熱咀電線(xiàn)接位有否編號?

  37. Horn pin clearance hole?斜邊與行位有否空間?

  38. Hydraulic actuated slide together withelectrical limit switch. 行位采用油壓推動(dòng),配合安全電制。

  39. Heaters fitted+0.002/-.000, leadstagged and connected toterminal. 熱嘴裝配,電線(xiàn)源頭、尾有否安裝穩固。(+0.002/.000)。

  40. Inserts keyed and numbered to preventincorrect assembly. 鑲件定位和編號以防止不正確的組裝。

 

  41. Jaw angle 3 deg.more than anglepins(<25 degree). 斜面角度要比行位斜邊角度大3度(<25度)。

  42. Keep enough space to run waterline atslide /lifter/majorinserts. 在行位、斜頂、主要鑲件處保留足夠位置(空間)布置水槽。

  42. Lifter angle less than 15 degree. 斜頂角度小于15度。

  43. Lifter rods dia, less than 1". 斜頂桿直徑不能少于1"。

  44. Limit switch in tact and protected. 是否已安裝限位制?

  45. Moldbase and steel dimensioned. 模坯和鋼料號的標注。

  46. Minimum 5 deg.for shut-off. 斜頂鑲件最小5度插穿。

  47. Mechanism for sequence?動(dòng)作機構是否正確?

  48. Mold safety straps installed andpainted red?是否已安裝安全帶及噴上正確顏色在模坯上?

  49. Mould flow and simulation should becarried out for the bestgate location, filling analysis, pressure distributionand heat distribution. 適宜應用模擬的模具注塑過(guò)程,注射分析、壓力分布及溫度分布以確定最佳入水位置、流道尺寸和疏氣位置等。

  50. Mould should be designed with maximumcooling and withappropriate amount of ejection points. 模具在設計上要做到盡快冷卻,上、下內模高溫點(diǎn)應該有個(gè)別的冷卻,應有適量頂針。

 

  51. Mould should be able to run fullyautomatic. Large part shouldbe picked up by robot. 模具能夠全自動(dòng)生產(chǎn),大的零件應由機械手拿出。

  52. Mould should be tested to meet adefined Cpk quality standard. 模具經(jīng)過(guò)測試,符合預定的Cpk質(zhì)量標準。

  53. Mould should have safety features toprotect accidental damage,incorrect assembly and set up of mould. 模具應具備可以預防意外損害及錯誤安裝等安全特性。

  54. Mould halves requiring accuratealignment of core and cavity,and shut off should have appropriate part linelocks. 上、下模需要精確配合或有擦位的地方,模具一定要有直身鎖。

  55. Mould requiring heating should haveinsulator plate. 需要加熱的模具,必須有隔熱板。

  56. Mould preferred to run automatic;self-degating wheneverpossible. 模具違禁詞能自動(dòng)生產(chǎn),模具盡可能自斷水口。

  57. No obstructions on buttom surface ofmold?模具必須穩定位置如有凸出物請加腳座,是否完成?

  58. Overall mold size of the moldbase &shut height 模坯長(cháng)寬和模厚(模架的長(cháng)寬)

  59. Outlets accessible and marked " INOUT and NUMBER"?出入水位有否打上IN 、OUT 字碼?

  60. Protruding items shown and protected. 畫(huà)出突出部件并做好保護。

 

  61. Parting line at the acceptable surface.合模分布在合理可接受的表面。

  62. Put waterline as much aspossible/wherver possible. 盡可能布置多的運水。

  63. Put waterline for slide /lifter/insertwherver possible. 盡可能在行位、斜、鑲件布置運水。

  64. Parting line cleared and releasedproperly? 分模線(xiàn)是否正確?

  65. Proper locating ring and diameter?定位圈尺寸及直徑是否正確?

  66. Proper radius and orifice on spruebushing and keyed.唧嘴R及管釘是否正確?

  67. Part line lock recommended when thereis shut off. 當有擦位時(shí),違禁詞有直身鎖保護。

  68. Protruding items shown and protected. 如有零件凸出,模坯請加保護物。

  69. Proper K.O. holes size and location. 頂棍孔尺寸及位置是否正確?

  70. Runners to be balanced. 流道必平衡。

 

 71. Runners cross section type and size asper standard. 流道切面形狀和尺寸符合標準。

  72. Runner and parts should be ejectedautomatically .Multipleejection should be avoided. 頂出方法可使流道與產(chǎn)品自動(dòng)掉下,避免運用多次頂出方法。

  73. Sufficient view and section. 足夠的視圖和切面圖。

  74. Safety Strap in red. 模塊藏入模坯,要涂成紅色。

  75. Standing steel supported to keepstable. 加撐腳以保前、后模能平穩放置。

  76. Support pillars>50% part projectionarea , steel :1040。撐頭面積大于50%的產(chǎn)品投影面積,材料:1040。

  77. Safety strap clear tie bar? 鎖模塊與哥林柱沖突嗎?

  78. Sucker with reverse 10 deg. Undercut.10度倒扣的流道拉料桿。

  79. Steel type & hardness of slide&heel blocks. 行位和壓條的料號和硬度。

  80. Sufficient stroke oflifters(1/16"+ undercut size)?斜頂是否有足夠的行程(1/16”+倒扣尺寸)?

 

 81. Sufficient stroke for floating plate?浮動(dòng)板是否有足夠的行程?

  82. Sufficient stroke as well as part andrunner falls clear. 是否有足夠的行程使品和流道脫落?

  83. Spring around return pins and pressratio<33? 是否有回針的彈簧及其壓縮比(<33%)?

  84. Special instruction stamped on top andoperator side?客戶(hù)如有特別指示請打在模坯頂及操作面上,有否完成?

  85. Screws tight and all installed?螺絲是否全部收緊?

  86. Support posts ground and screwed toclamp plate and pre-loaded. 撐頭是否高出方鐵?

  87. Spring pockets correct depth , springdeflection max.40%?全部彈弓壓縮比是否為1/3 ?

  88. Standing steel well supported?成品與內模之間的鋼材是否足夠?

  89. Single dro of cold sprue gating isdesigned after moldflowanalysis, which ensures a balance flow of plastic andeasy for moulding. 用moldflow分析決定產(chǎn)品的入水位置,使膠料分流平均,易于注塑。

  90. Self-degating whenever possible .Hotrunner  system should beconsidered.…… 熱流道系統應該加以考慮。

 

 

  91. Standard components should be used. 盡量使用標準件。

  92. Semi-automatic and use of mould releaseacceptable. 半自動(dòng)工手放鑲件也可。

  93. updat title block/revision. 更新標題欄/版本。

  94. Use standard components whenappropriate. 適當的時(shí)候使用標準件。

  95. View of deepest point 最深點(diǎn)(位置)的剖切視圖

  96. Water circuits should run out form theejection box. 運水應從出水槽中流出。

  97. Waterlines clear tie bar and clampslot? 運水是否同哥林柱和模槽有沖突?

  98. Will mould fit in quoted press? 可否配合客戶(hù)啤機?

  99. Waterlines clear tie bars. 運水喉咀接駁位要離開(kāi)啤機呵林柱咀接駁。

  100. Waterline clear clamp slot. 運水喉咀接駁位要離開(kāi)啤機碼模坑。

服務(wù)熱線(xiàn)

0755-26825352

企業(yè)微信銷(xiāo)售咨詢(xún)